以大連港蛤魚灣港區(qū)30萬噸級碼頭工程為實例,詳細(xì)分析了半潛駁下潛區(qū)水深不滿足沉箱浮游穩(wěn)定要求的問 題解決方法,并與營口港30萬噸級原油碼頭工程中的解決方法進(jìn)行對比。實際施工結(jié)果表明,起重船助浮大型沉箱半潛駁 出運工藝是切實可行的。該方法進(jìn)一步完善了原有半潛駁出運沉箱工藝的不足,擴(kuò)展了半潛駁出運沉箱工藝應(yīng)用范圍。 關(guān)鍵詞:大型圓沉箱;起重船助浮;半潛駁出運;浮游穩(wěn)定 Shipping of large-scale circular cassion by semi-submersible barge assisted by crane ship Abstract: Taking the 300000 ton-class oil terminal engineering of catfish bay in Dalian Port as an example, this paper analyzes the solution for the problem that the largest depth of semi-submersible barge could not meet the request of floating stability of large-scale caisson.A comparison with the method of 300000 ton-class oil terminal engineering in Yingkou port is made.The result shows that the technology of semi-submersible barge shipping large-scale caisson assisted by crane ship is feasible.This method is an improvement of the original shipping technology for the large-scale caisson and had broadened the appliance field of the semi-submersible barge
近10年我國北方港口采用半潛駁出運沉箱的 工程逐漸增多1-3。半潛駁在沉箱下水和浮運施工 中均具有明顯優(yōu)勢。半潛駁沉箱下水工藝既適用 于臨時沉箱預(yù)制廠,又可用于固定預(yù)制廠,是滑 道、干塢、浮船塢等沉箱工藝的必要補(bǔ)充[14]。海 上運輸沉箱時,采用半潛駁可以較好應(yīng)對狀態(tài)復(fù) 雜的海洋環(huán)境,特別適合運輸大型的或因重心高 導(dǎo)致浮游穩(wěn)定性不足的沉箱!-9。 然而,2008年大連港鯰魚灣港區(qū)30萬噸級原 油碼頭工程遇到半潛駁下潛到極限深度后沉箱仍 不能正常起浮的問題,同期營口港30萬噸級原油 碼頭工程也遇到類似難題。2009年9月1日實施的 JTS 167-2—2009《重力式碼頭設(shè)計與施工規(guī)范》 (簡稱規(guī)范)增加了應(yīng)對這種工況的條文:半潛 駁最大潛深不滿足下潛區(qū)水深要求時,沉箱應(yīng)減 少壓載,可采用起重船或浮筒助浮H。但目前起重 船或浮筒助浮半潛駁出運沉箱的工程實例很少。 半潛駁出運沉箱工藝亟需完善。 本研究以大連港鯰魚灣港區(qū)30萬噸級碼頭工 程為實例,詳細(xì)介紹了半潛駁下潛區(qū)水深不滿足 沉箱浮游穩(wěn)定要求時的問題解決方法,并與營口港 30萬噸級原油碼頭工程中的解決方法進(jìn)行對比。 1 工程概況 大連港鲇魚灣港區(qū)22°碼頭為30萬噸級進(jìn)口原 油接卸碼頭,泊位設(shè)計年通過能力為1900萬t, 是 目前國內(nèi)最大的原油接卸碼頭,由1個工作平臺、 4個靠船墩、6個系纜墩、1座引橋組成。這種海中孤 立墩式碼頭常優(yōu)先采用鋼筋混凝土圓沉箱作為重力 墩。碼頭部分共安裝大型沉箱14個,各沉箱的位置、 直徑、高度和質(zhì)量列于表1,立面和剖面見圖1。 表1 壓載前沉箱主要技術(shù)參數(shù)
注:加載前將沉箱視為均質(zhì)物體,形心與重心重合。計算質(zhì)量時,例筋混 凝土密度取2500kg/m2。 a)立面圖 b)剖面圖 圖1 鲇魚灣港區(qū)22°原油泊位沉箱 受周圍沉箱預(yù)制場設(shè)備、海流及風(fēng)速環(huán)境狀 態(tài)影響,鲇魚灣港區(qū)自質(zhì)量3000t 以上的沉箱一 直采用8*半潛駁下水和浮運,該船工作參數(shù)為: 長度58m, 寬度36 m, 型深5.5 m, 甲板支撐梁高 1.1m, 工作吃水3.8m, 最大舉力50 MN,最大潛深 23.5m,主甲板最大沉深18m,甲板荷載80 kPa,滿載 水線至最大潛深時間2.25h。 2 沉箱浮游穩(wěn)定分析 根據(jù)8*半潛駁性能,沉箱質(zhì)量為3800t時,重 心距甲板允許高度為12m, 由表1沉箱重心高度和 表2甲板支撐梁高度數(shù)據(jù),浮運過程中14個沉箱的 重心高度最大值為11.42 m, 滿足半潛駁浮運對沉 箱重心高度的要求。依據(jù)規(guī)范,沉箱靠自身浮游 穩(wěn)定時,必須按方程(1)驗算沉箱浮游穩(wěn)定性, 同時下潛區(qū)水深需滿足方程(3)要求。沉箱浮游 穩(wěn)定計算結(jié)果列于表2,計算示意見圖2,下潛區(qū) 水深計算結(jié)果見表3,計算示意見圖3。 m=p-a (1) (2) H≥T+h?cos+h?cosa+h?+h?+1;sina (3) 式中:為沉箱定傾半徑,為圖2中定傾中心M至浮 心C的距離; m為定傾高度,為圖2中M至中心G 的距離;a 為圖2中G至C的距離;1為沉箱在水面 處的斷面對縱向中心軸的慣性矩;i為第i箱格內(nèi) 壓載水的水面對該水面縱向中心軸的慣性矩; V 為沉箱的排水量;H 為下潛區(qū)水深; T為沉箱的 浮游穩(wěn)定吃水深度; h?為半潛駁的型深; h?為甲 板支撐梁高度; h?為墊塊與沉箱底面間的富裕水 深,取0.3 m;h? 為半潛駁與下潛區(qū)基面的最小富 裕水深,取0.5m;a 為沉箱起浮時半潛駁甲板面與 水面的夾角,本次計算取α=10°; l,為沉箱底面對 應(yīng)的半潛駁長度,如圖3所示。 圖2 沉箱浮游穩(wěn)定計算示意圖
圖3 下潛區(qū)水深計算示意圖 表2和表3計算結(jié)果表明:14個沉箱的定傾高度均 不小于0.2 m, 滿足規(guī)范中關(guān)于沉箱近程浮運的浮 游穩(wěn)定性要求;但此時1*,4*,5*,6*,7*,8*, 11"墩沉箱要求的下潛區(qū)水深大于碼頭前沿水深, 施工中即使半潛駁下潛至極限深度,這10個沉 箱也無法正常起浮。采用常規(guī)半潛駁沉箱出運 工藝已經(jīng)不能滿足工程要求,如果采取港池挖 泥措施或換用其它沉箱出運方法,則需另行租 用船只或改造碼頭,這都將大幅增加沉箱出運成 本。從經(jīng)濟(jì)和安全兩方面考慮,采用起重船助浮 大型沉箱半潛駁出運工藝值得研究和試驗。
表2 壓載后沉箱浮游穩(wěn)定計算結(jié)果
注:注人壓載水后沉箱形心與重心不再重合。計算時,海水密度取1.025kg/m3。
表3 半潛駁下潛區(qū)水深要求
注:泊位前沿水深為27.0m。 3 起重船助浮大型沉箱半潛駁出運工藝研究 3.1 吊浮計算 首先進(jìn)行沉箱吊浮計算,確定吊點數(shù)量和吊環(huán) 直徑、鋼絲繩直徑和角度等,計算結(jié)果列于表4。 根據(jù)計算,偏于安全的采用700 t起重船助浮大型 圓沉箱、φ94的壓制鋼芯鋼絲繩、φ75的圓鋼吊 環(huán),配套使用φ80的卡環(huán)。
表 4 沉 箱 吊 浮 計 算 結(jié) 果 | | | | | | | | | | | | | | | | | 293.47 316.05 338.62 361.20 372.48° | | | 597.1 643.0 689,0 734.9 757.9 | | 76.62 79.51 82.30 85.00 86.32 | 66.70 69.21 71.64 73.99 75.14 | | | | | 1.10 1.20 1.3 1.40 1.65 0.7 0.8 | 248.32 270.90 293.47 316.05 372.48° 182.49 208.56 | | | 505.2 551.2 597.1 643.0 757.9 371.3 424.3 | | 70.48 73.6 76.62 79.51 86.32 60.42 64.59 | 61.35 64.08 66.70 69.21 75.14 52.59 56.23 | | | | | | 234.63 260.70 286.77 323.27° | | | | | | |
注:1.平臺墩和系纜墩吊高每增加10cm, 吊質(zhì)量增加22.6t;靠船墩吊高每增加10cm, 吊質(zhì)量增加23.2t。2.“”為本工程中700起重 船的吊質(zhì)量限制值。 3.2 主要工序施工方法 根據(jù)氣象資料,確定出運時滿足:風(fēng)速≤ 6級,流速≤1.0m/s, 波高≤1.5m, 視程>1000m。 1)沉箱平移、拖運。 沉箱在預(yù)制場經(jīng)平移上半潛駁后,半潛駁8” 上浮,拖輪系纜拖航。在拖運過程中要注意觀察 半潛駁的縱橫傾變化情況,及時調(diào)整壓載水,確 保半潛駁及沉箱平穩(wěn),并注意通過調(diào)整航向來降 低半潛駁的搖擺度。 2)半潛駁駐位、下潛。 沉箱隨半潛駁拖運至現(xiàn)場半潛駁下潛區(qū),下 錨駐位后即可開始下潛。要求半潛駁“跨流駐位、 順流出箱”,半潛駁拋錨時用民船配合作業(yè)。 3)沉箱壓水。 半潛駁下潛淹沒沉箱進(jìn)水孔時,沉箱開始自 然壓水。沉箱壓水過程中重心位置可能發(fā)生較大 變化,要注意調(diào)整半潛駁各艙室進(jìn)水速度克服由 于沉箱重心位置變化及不平衡壓載所造成的傾翻 力矩。 4)起重船駐位。 起重船順流方向開始駐位,船尾下八字錨, 船首通八字纜到浮鼓。 5)沉箱停止壓水。 沉箱艙內(nèi)水深達(dá)到計算壓水高度,沉箱滿 足浮游穩(wěn)定壓水后,半潛駁停止下潛,起重人員 關(guān)閉進(jìn)水孔,沉箱停止壓水,檢查進(jìn)水孔是否漏 水。若漏水,潛水人員水下封堵。 6)起重船助浮沉箱。 起重船拖兩根纜上沉箱拖環(huán),鉤頭正對沉箱 中心,起重人員將起重船鉤頭的鋼絲扣和沉箱吊 環(huán)用80t 卡環(huán)連接,起重船做吊浮準(zhǔn)備。 7)半潛駁繼續(xù)下潛。 半潛駁開始繼續(xù)下潛,起重船按表4吊浮計算 數(shù)據(jù)施加荷載。半潛駁下潛達(dá)到沉箱穩(wěn)定吃水2/3 高度時拖輪靠前,系好拖帶纜繩,注意拖輪不允 許碰靠沉箱。當(dāng)沉箱實際吃水接近穩(wěn)定吃水高度 即沉箱快要浮起時,半潛駁調(diào)平(縱傾和橫傾均 為零)。半潛駁繼續(xù)下潛0.5~1.0 m時沉箱離開半 潛駁,半潛駁可加速下潛,至最大下潛深度23.5m 時停止,起重船逐漸給力到設(shè)計值,使沉箱與半 潛駁脫離30~50 cm, 吊浮過程中嚴(yán)格控制吊船吊 重,禁止超過限制吊重。 8)沉箱浮游穩(wěn)定。 沉箱順流出箱、被帶出半潛駁后,起重船下 落鉤頭,逐步解除吊重,讓沉箱自然漂浮。 9)解開沉箱與起重船、半潛駁的聯(lián)系。 起重船解開船頭八字纜,第1個拖輪進(jìn)入沉箱 和半潛駁之間,引3根纜和沉箱綁在一起。起重人 員解開鉤頭的鋼絲扣,起重船摘掉沉箱拖環(huán)上的 兩根纜,起重船絞后錨撤走。在塔樓上的起重人 員解除沉箱掛在半潛駁上的另兩根纜繩,第2個拖 輪靠近,捆好拖纜后,兩個拖輪傍拖沉箱到儲存 場儲存或現(xiàn)場安裝。 3.3 類似工程對比 與大連港鲇魚灣港區(qū)30萬噸級原油碼頭工程 同期施工的營口港30萬噸級原油碼頭工程也采用 了鋼筋混凝土圓沉箱,并用半潛駁出運沉箱,同 時也遇到了類似的難題:1)沉箱重心高度超出半 潛駁許用極限重心高度,導(dǎo)致平潛作業(yè)時穩(wěn)定性 不能滿足規(guī)范要求;2)沉箱浮游穩(wěn)定吃水17.53m, 但半潛駁下潛至最大潛深后沉箱最大吃水也只有 13.2 m。最終營口港工程中采用半潛駁艏傾下潛加 起重船吊扶出運的方法解決了問題。 大連港鲇魚灣港區(qū)30萬噸級原油碼頭工 程與營口港30萬噸級原油碼頭工程的主要不同之 處在于:1)鲇魚灣港區(qū)工程鋼筋混凝土圓沉箱的 質(zhì)量更大、高度更高,其中,4”,5°,7°,8*墩沉 箱質(zhì)量為營口港圓沉箱質(zhì)量的1.35倍,高度高了 近2 m; 最輕的9°和10°沉箱質(zhì)量也超過了2800 t, 比營口港圓沉箱重70t, 因此該工程起重船助浮施 工難度更高;2)鲇魚灣港區(qū)工程不存在沉箱重心 高度超出半潛駁許用極限重心高度的問題,因此 施工安全性更高。 大連港鲇魚灣港區(qū)30萬噸級原油碼頭工程和 營口港30萬噸級原油碼頭工程是兩個解決大型沉 箱半潛駁出運問題的成功實例,兩者既可相互印 證,又可以相互補(bǔ)充。兩個工程均完善了特殊工 況下現(xiàn)有的半潛駁出運沉箱工藝的不足,擴(kuò)展了 其應(yīng)用范圍,同時為JTS 167-2—2009《重力式碼 頭設(shè)計與施工規(guī)范》中指出的“采用起重船或浮筒助浮”沉箱工藝積累了翔實的數(shù)據(jù)。
4 結(jié)論 在大連港鲇魚灣港區(qū)使用起重船助浮大型沉 箱半潛駁出運工藝可以解決半潛駁下潛區(qū)水淺導(dǎo) 致的沉箱浮游穩(wěn)定性不足問題。 起重船助浮大型沉箱半潛駁出運工藝進(jìn)一步 完善了現(xiàn)有的半潛駁出運沉箱工藝的不足,并擴(kuò) 展了半潛駁出運沉箱工藝應(yīng)用范圍。同時,鲇 魚灣港區(qū)30萬噸級原油碼頭工程也說明,充分 利用現(xiàn)有船機(jī)設(shè)備,大膽進(jìn)行技術(shù)實踐,可顯著 提高沉箱施工能力,獲得明顯的經(jīng)濟(jì)效益和社會 效益。 大連港鲇魚灣港區(qū)30萬噸級原油碼頭工程和 營口港30萬噸級原油碼頭工程中遇到的沉箱浮運 問題有相似之處,既可相互印證,又可以相互補(bǔ) 充。這兩個實例證實了JTS 167-2—2009《重力式 碼頭設(shè)計與施工規(guī)范》中“采用起重船或浮筒助 浮”方法的可行性。